DSpace Repository

Exploring applicability of Theory of Constraints to projects: Critical Chain Project Management and beyond

Show simple item record

dc.contributor.advisor Mabin, Victoria
dc.contributor.advisor Sheffield, James
dc.contributor.author Mirzaei, Maryam
dc.date.accessioned 2016-04-11T23:48:54Z
dc.date.accessioned 2022-11-03T18:55:49Z
dc.date.available 2016-04-11T23:48:54Z
dc.date.available 2022-11-03T18:55:49Z
dc.date.copyright 2016
dc.date.issued 2016
dc.identifier.uri https://ir.wgtn.ac.nz/handle/123456789/29888
dc.description.abstract Theory of Constraints (TOC) suggests focusing on the core constraint as the leverage point in any system. Critical Chain Project Management (CCPM), as an application of TOC to project management, has been a controversial topic. On the one hand, CCPM has made dramatic improvement in some contexts, and on the other hand, it has been criticised for its lack of applicability to all projects. However, no clear boundary has been yet defined for CCPM applicability. This research set out to articulate the boundaries of CCPM’s applicability and extend the application of TOC beyond those boundaries. According to TOC, the core constraint prevents the system from achieving more of its goal. CCPM specifically suggests that the core constraint in every single project is the longest chain of dependent activities. How did CCPM arrive at this very specific definition of the constraint? This research re-examines CCPM against empirical cases. The above examination required an in-depth analysis of both the theoretical assumptions of CCPM and the empirical reality of the projects. The abductive process in this research facilitated an iterative learning loop between theory and empirical study. The research is based on a multi-case study consisting of a total of 10 cases from a diverse range of industries. The literature analysis was complemented by text mining of a comprehensive CCPM database using NVivo and Leximancer software. CCPM assumes that a project’s goal has a predefined and fixed value which is set at the beginning of the project. While several projects in the case study research did exhibit this characteristic, there were also projects in which achieving more of the goal within the same project was possible. The research also found that in some projects the baton (the project) was sequentially passed between project actors, while in other projects a dedicated team carried the baton all the way through. This re-examination of CCPM led to a 2x2 constraint classification model. Four cases, each occupying one quadrant of the above model were further analysed. The findings suggest that, when the value of the project is fixed and the project is executed by a non-dedicated team, the constraint is the longest chain of dependent activities. However, if a fixed-value project is executed by a dedicated team, the system ‘is’ the team and therefore its weakest link is the most constrained resource. The findings also suggest that projects with variable value are often confronted by various aspects of scope formulation, irrespective of their team type. Analysis also explored the use of alternative TOC solutions in each case. The above constraint classification model predicts that applicability of CCPM requires fixed value of the output, sequential workflow, and a non-dedicated team. Further analysis suggests two other prerequisites to CCPM applicability: unity of purpose and urgency. This research stands on the shoulders of a giant: CCPM. The findings challenge CCPM’s assumptions. Through this process of assumption-challenging, the research extends and enhances the application of TOC to the broader project management realm. en_NZ
dc.format pdf en_NZ
dc.language en_NZ
dc.language.iso en_NZ
dc.publisher Te Herenga Waka—Victoria University of Wellington en_NZ
dc.rights Access is restricted to staff and students only. For information please contact the Library. en_NZ
dc.subject Project management en_NZ
dc.subject Theory of constraint en_NZ
dc.subject Critical chain en_NZ
dc.title Exploring applicability of Theory of Constraints to projects: Critical Chain Project Management and beyond en_NZ
dc.type Text en_NZ
vuwschema.contributor.unit Victoria Management School en_NZ
vuwschema.subject.anzsrcfor 080609 Information Systems Management en_NZ
vuwschema.subject.anzsrcfor 091005 Manufacturing Management en_NZ
vuwschema.subject.anzsrcfor 120201 Building Construction Management and Project Planning en_NZ
vuwschema.subject.anzsrcfor 150301 Business Information Management (incl. Records, Knowledge and Information Management, and Intelligence) en_NZ
vuwschema.subject.anzsrcfor 150305 Human Resources Management en_NZ
vuwschema.subject.anzsrcfor 150310 Organisation and Management Theory en_NZ
vuwschema.subject.anzsrcfor 150312 Organisational Planning and Management en_NZ
vuwschema.subject.anzsrcfor 170202 Decision Making en_NZ
vuwschema.subject.anzsrcseo 970115 Expanding Knowledge in Commerce, Management, Tourism and Services en_NZ
vuwschema.type.vuw Awarded Doctoral Thesis en_NZ
thesis.degree.discipline Management en_NZ
thesis.degree.grantor Te Herenga Waka—Victoria University of Wellington en_NZ
thesis.degree.level Doctoral en_NZ
thesis.degree.name Doctor of Philosophy en_NZ


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account