DSpace Repository

Project co-ordination: a study of building services design and project control through a case study

Show simple item record

dc.contributor.author Lobb, David
dc.date.accessioned 2011-07-03T23:56:06Z
dc.date.accessioned 2022-10-26T23:18:10Z
dc.date.available 2011-07-03T23:56:06Z
dc.date.available 2022-10-26T23:18:10Z
dc.date.copyright 1980
dc.date.issued 1980
dc.identifier.uri https://ir.wgtn.ac.nz/handle/123456789/25167
dc.description.abstract This study investigates co-ordination and control of building services relative to the building process by studying in detail a single project. The case study is analysed to establish a pattern of co-ordination relative to a building process model, and to identify constraints against co-ordination in practice. The cost of building services co-ordination problems is also studied. The study demonstrated the applicability of the case study method of analysis but concluded that a much larger number of cases would need to be studied in order to isolate constraints acting against co-ordination and to enable recommendations to improve the design process to be made. en_NZ
dc.format pdf en_NZ
dc.language en_NZ
dc.language.iso en_NZ
dc.publisher Te Herenga Waka—Victoria University of Wellington en_NZ
dc.title Project co-ordination: a study of building services design and project control through a case study en_NZ
dc.type Text en_NZ
vuwschema.type.vuw Bachelors Research Paper or Project en_NZ
thesis.degree.discipline Architecture en_NZ
thesis.degree.grantor Te Herenga Waka—Victoria University of Wellington en_NZ
thesis.degree.name Bachelor Of Architecture en_NZ


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account